From: Daniel Berger Date: 2008-09-09T23:13:47+09:00 Subject: Re: Per suite unit test setup and teardown On Aug 28, 5:38 am, Peter Hickman wrote: > I am putting some tests together that need to access an external service > which I can use setup() and teardown() to control. The problem is that > these methods are run before and after each test, this slows things down > quite a bit. Ideally there would be one setup before all the tests are > run and one teardown at the end. Nunit has this functionality and I'm > sure I've seen it in other frameworks. > > Is there a way to get until test to do this or will I have to end up > putting all my tests in a single test method? They were added to test-unit 2.0: http://rubyforge.org/forum/forum.php?forum_id=25263 gem install test-unit Regards, Dan