From: Peter Hickman Date: 2008-08-28T20:38:04+09:00 Subject: Per suite unit test setup and teardown I am putting some tests together that need to access an external service which I can use setup() and teardown() to control. The problem is that these methods are run before and after each test, this slows things down quite a bit. Ideally there would be one setup before all the tests are run and one teardown at the end. Nunit has this functionality and I'm sure I've seen it in other frameworks. Is there a way to get until test to do this or will I have to end up putting all my tests in a single test method?