From: Sy Ali Date: 2006-05-14T06:44:52+09:00 Subject: Forcing some code to run at the end of tests I'm playing with some test scripts, and I cannot for the life of me ensure that a block of code is run after every test is run. I can think of some ugly ways to do it.. but is there an elegant way which I missed?