From: Johan Allard Date: 2004-12-11T07:13:01+09:00 Subject: Date manipulation in rails Hi all, I live in australia in in Australia dates are written as DD/MM/YYYY. In the database, the dates are stored as YYYY-MM-DD. I want to use the before_validation function and check if #{(\d+)/(\d+)/(\d+)} and then convert to the correct iso date format. The problem is that when the before_validation function kicks in, the date variable is now a Date object. It is no longer a string, and it has been formatted using the american MM/DD/YYYY format to YYYY-MM-DD. Since it is a date object, it is not possible to check how the date was formatted. Currently I run the check in the controller and to keep the model intact it would be fantastic if there was a way of doing this in the before_validation function (or similar) instead. Thank you //johan